STRIXT
Construction · Risk · Intelligence
Phase 1 · Foundations

#1 construction risk intelligence

Live interpretation. Audit ready by default.

Day-1 Risk Profile

Four-rail projection from reference data, method library, contract envelope, and live plan — wired the moment your project clears intake. No prompting. No prep.

Red · Stop Amber · Watch Green · Clear Yellow · Live
RISK_CO_PILOT · LIVE
Heads-up. Anchor row A-12 is 38 hours behind the 7-day moving average. Adjacent monitoring points show 2.1 mm lateral drift — within tolerance, but trending toward your stop-work threshold (3.0 mm). Recommend WPC review before tomorrow's pour.
Source · L2 method · L4 plan · Inclinometer IN-04
Project
Status
Progress
King + Bathurst · Shoring
Watch
62%
Brookfield Tower · CFA piles
Clear
88%
Port Lands · Underpin
Stop
24%
STRIXT
Construction · Risk · Intelligence
Phase 1 · Foundations

#1 construction risk intelligence

Live interpretation. Audit ready by default.

Day-1 Risk Profile

Four-rail projection from reference data, method library, contract envelope, and live plan — wired the moment your project clears intake. No prompting. No prep.

Red · Stop Amber · Watch Green · Clear Yellow · Live
RISK_CO_PILOT · LIVE
Heads-up. Anchor row A-12 is 38 hours behind the 7-day moving average. Adjacent monitoring points show 2.1 mm lateral drift — within tolerance, but trending toward your stop-work threshold (3.0 mm). Recommend WPC review before tomorrow's pour.
Source · L2 method · L4 plan · Inclinometer IN-04
Project
Status
Progress
King + Bathurst · Shoring
Watch
62%
Brookfield Tower · CFA piles
Clear
88%
Port Lands · Underpin
Stop
24%