STRIXT
Construction · Risk · Intelligence
Phase 1 · Foundations

#1 construction risk intelligence.

Live interpretation. Audit ready by default.

Mission Control

Catch slippage before the lien window closes.

Strixt reads every daily report, RFI, and submittal against your CCDC contract and method statements — then surfaces the three risks worth your morning.

Red · 3 Amber · 7 Green · 21 Co-Pilot On
Risk_Co_Pilot · Live
Why did Pier 14 jump to Red overnight?
Concrete cure gate not met. Yesterday's pour logged at 18:40, ambient 4°C. Method §7.3 requires 75% f'c before strand stress — earliest release is now Wed 06:00, pushing the anchor crew 1.5 days. SRC · MS §7.3 · DR-2026-05-24 · ADL #1182
Bow River TowerPRJ-104Red62%
Yonge Line Stn 7PRJ-118Amber41%
Pacific Pier RetrofitPRJ-127Green88%
STRIXT
Construction · Risk · Intelligence
Phase 1 · Foundations

#1 construction risk intelligence.

Live interpretation. Audit ready by default.

Field Brief

A P.Eng. stamp's worth of diligence, every morning.

Every clause, every hold-point, every cure gate — cross-checked against last night's report before the crew tools up. The kind of file room a surety actually opens.

Red · 3 Amber · 7 Green · 21 Co-Pilot On
Risk_Co_Pilot · Live
Are we exposed if the subcontractor walks Friday?
Yes — partial. CCDC 2-2020 §2.2.7 requires 10 working days' notice for default. Your last 3 daily reports already cite missed cure gates — sufficient for a §2.2 termination letter, but lien window in AB closes day 60. SRC · CCDC2-2020 §2.2.7 · AB PPCLA §41
Bow River TowerPRJ-104Red62%
Yonge Line Stn 7PRJ-118Amber41%
Pacific Pier RetrofitPRJ-127Green88%