Strixt reads every daily report, RFI, and submittal against your CCDC contract and method statements — then surfaces the three risks worth your morning.
Red · 3Amber · 7Green · 21Co-Pilot On
Risk_Co_Pilot · Live
Why did Pier 14 jump to Red overnight?
Concrete cure gate not met. Yesterday's pour logged at 18:40, ambient 4°C. Method §7.3 requires 75% f'c before strand stress — earliest release is now Wed 06:00, pushing the anchor crew 1.5 days.
SRC · MS §7.3 · DR-2026-05-24 · ADL #1182
Bow River TowerPRJ-104Red62%
Yonge Line Stn 7PRJ-118Amber41%
Pacific Pier RetrofitPRJ-127Green88%
STRIXT
Construction · Risk · Intelligence
Phase 1 · Foundations
#1 construction risk intelligence.
Live interpretation. Audit ready by default.
Field Brief
A P.Eng. stamp's worth of diligence, every morning.
Every clause, every hold-point, every cure gate — cross-checked against last night's report before the crew tools up. The kind of file room a surety actually opens.
Red · 3Amber · 7Green · 21Co-Pilot On
Risk_Co_Pilot · Live
Are we exposed if the subcontractor walks Friday?
Yes — partial. CCDC 2-2020 §2.2.7 requires 10 working days' notice for default. Your last 3 daily reports already cite missed cure gates — sufficient for a §2.2 termination letter, but lien window in AB closes day 60.
SRC · CCDC2-2020 §2.2.7 · AB PPCLA §41